back to collection
Search gallery:

2017 04-19 Boathouse at Canal Dock Construction Progress Documentation 10 (28 images)

View: 50 | All
Boathouse at Canal Dock Phase II | Connecticut DOT State Project #92-570/92-674. Tenth Progress Documentation Photography Submission, 19 April 2017. New Haven Harbor, Connecticut. Steel Erection, primarily the Second Level and Façade. First Level conduit and other MEP.
View: 50 | All