back to collection
Search gallery:

Groton New London Airport | Construction Progress 2005 (97 images)

View: 50 | All
Next >
Groton-New London Airport, CT-DOT Project #58-299, Taxiway Renovations, Resurfacing. Progress Photography for Mizzy Construction, Inc. April through October 2005.
Monthly Progress Images have been converted to B&W and reduced in size. All photos captured in Camera RAW DCR format and are available at full resolution by request.
View: 50 | All
Next >