James R Anderson Photography

  • Portfolio
  • Image Archives
  • About
  • Contact
  • Legacy Website : photog.com
Show Navigation
search results
Cart Lightbox Client Area
1 of 1173 Next

New Pearl Harbor Memorial Bridge Construction

Add to Cart Add to Lightbox Download

Connection between completed Contract B1 and Under Construction Contract B. West Northbound Approach Steel-Plate Girder Spans to the New Pearl Harbor Memorial Bridge at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered Design Bridge in the United States.

Filename
110616-001-Pearl-Harbor-Bridge-Construction-New-Haven.JPG
Copyright
James R Anderson
Image Size
4820x3192 / 5.4MB
www.photog.com/copyright
www.photog.com
95 Approach Bridge Chronology Concrete CONNDOT Connecticut Construction Contract B Contractor Corridor Crane Crossing CT-DOT Deck Form Harbor Highway I-95 Interstate Joint Venture Lines NB New Haven Northbound PCL Pearl Pier Progress Project Project 92-618 Q Bridge Quinnipiac Ramp River Roadway Route Span Structure System Transmission Transportation Turnpike Walsh Walsh-PCL
Contained in galleries
2011 06-16 New Pearl Harbor Memorial "Q" Bridge | Contract B Construction Progress | New Haven CT
Connection between completed Contract B1 and Under Construction Contract B. West Northbound Approach Steel-Plate Girder Spans to the New Pearl Harbor Memorial Bridge at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered Design Bridge in the United States.