Add to Cart Add to Lightbox DownloadDrainage Pipeline Excavation. Construction Progress Railroad Station Fairfield Metro Center. Site visit 4 of once per month Chronological Documentation. Workers in trench.
- Filename
- 081030-038-Fairfield-Metro-Station-Anderson-Photog.jpg
- Copyright
- James R Anderson
- Image Size
- 2084x1384 / 1.7MB
- www.photog.com/copyright
- www.photog.com
-
301-060 Amtrak Catenary Chronological Chronology Commuter Connecticut Construction Contract Contract 0301-0060 Contractor Corridor CT CT-DOT DOT Drainage Equipment Excavator Fairfield Fairfield Metro Center Infrastucture Metro Metro-North Middlesex Middlesex Inc. Northeast Corridor Passenger Passenger Rail Pipe Pit Platform Progess Progress Project Public Rail Railroad Rebar Site Station Tracks Train Transportation Trench