James R Anderson Photography

  • Portfolio
  • Image Archives
  • About
  • Contact
  • Legacy Website : photog.com
Show Navigation
search results
Cart Lightbox Client Area
Prev 46 of 986 Next

New Pearl Harbor Memorial Bridge Construction

Add to Cart Add to Lightbox Download

East End of Project, Southbound Approaches, New Pearl Harbor Memorial Bridge under Construction at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered & Designed Bridge in the United States.

Filename
110616-111-New-Haven-Harbor-Extradosed-Bridge-Construction.JPG
Copyright
James R Anderson
Image Size
4898x3247 / 5.8MB
www.photog.com/copyright
www.photog.com
95 Approach Bridge Chronology Concrete CONNDOT Connecticut Construction Contract B Contractor Corridor Crane Crossing CT-DOT Deck Equipment Form Harbor Highway I-95 Interstate Joint Venture Lines NB New Haven Northbound PCL Pearl Pier Progress Project Project 92-618 Q Bridge Quinnipiac Ramp River Roadway Route Span Structure System Transmission Transportation Turnpike Walsh Walsh-PCL
Contained in galleries
2011 06-16 New Pearl Harbor Memorial "Q" Bridge | Contract B Construction Progress | New Haven CT
East End of Project, Southbound Approaches, New Pearl Harbor Memorial Bridge under Construction at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered & Designed Bridge in the United States.