Prev
52 of 52
Pearl Harbor Memorial Bridge Construction Progress Photography 9 September 2011
Add to Cart Add to Lightbox DownloadPearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on September 9, 2011. New Northbound Span, Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States. 90 degree view to traveling deckwork and bridge tower.
- Filename
- 110909-07-Quinnipiac-Bridge-Construction-New-Haven-Contract-B.JPG
- Copyright
- James R Anderson
- Image Size
- 3081x4140 / 5.1MB
- www.photog.com/copyright
- www.photog.com
-
95 Bridge Chronological Chronology Concrete CONNDOT Connecticut Construction Contract B Contractor Copy Space Corridor Crane Crossing CT-DOT Deck Extradosed Foundation Harbor Highway I-95 Interchange Interstate Joint Venture Materials NB New Haven Northbound PCL Pearl Pier Progress Project Q Bridge Quinnipiac River Roadway Route Span Structure System Tower Transportation Turnpike Vertical Walsh Walsh-PCL Waterway
- Contained in galleries
- 2011 09-09 New Pearl Harbor Memorial "Q" Bridge | Contract B Construction Progress | New Haven CT