New Pearl Harbor Memorial Bridge Construction
Add to Cart Add to Lightbox DownloadEast Tower and Cast-in-place Hollow Box Girder, New Pearl Harbor Memorial Bridge under Construction at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered & Designed Bridge in the United States.
- Filename
- 110616-160-New-Haven-Harbor-Extradosed-Bridge-Construction.JPG
- Copyright
- James R Anderson
- Image Size
- 4779x3167 / 6.0MB
- www.photog.com/copyright
- www.photog.com
-
95 Approach Boom Bridge Cast-in-place Chronology Concrete CONNDOT Connecticut Construction Contract B Contractor Corridor Crossing CT-DOT Deck Extradosed Form Harbor Highway Hollow Box I-95 Interstate Joint Venture Lines Low-tower Materials NB New Haven Northbound PCL Pearl Pier Prestressed Progress Project Project 92-618 Q Bridge Quinnipiac Ramp Rebar River Roadway Route Span Structure System Tower Transmission Transportation Turnpike Walsh Walsh-PCL
- Contained in galleries
- 2011 06-16 New Pearl Harbor Memorial "Q" Bridge | Contract B Construction Progress | New Haven CT