James R Anderson Photography

  • Portfolio
  • Image Archives
  • About
  • Contact
  • Legacy Website : photog.com
Show Navigation
search results
Cart Lightbox Client Area
Prev 82 of 986 Next

New Pearl Harbor Memorial Bridge Construction

Add to Cart Add to Lightbox Download

Connection between completed Contract B1 and Under Construction Contract B. West Northbound Approach Steel-Plate Girder Spans to the New Pearl Harbor Memorial Bridge at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered Design Bridge in the United States.

Filename
110616-001-Pearl-Harbor-Bridge-Construction-New-Haven.JPG
Copyright
James R Anderson
Image Size
4820x3192 / 5.4MB
www.photog.com/copyright
www.photog.com
95 Approach Bridge Chronology Concrete CONNDOT Connecticut Construction Contract B Contractor Corridor Crane Crossing CT-DOT Deck Form Harbor Highway I-95 Interstate Joint Venture Lines NB New Haven Northbound PCL Pearl Pier Progress Project Project 92-618 Q Bridge Quinnipiac Ramp River Roadway Route Span Structure System Transmission Transportation Turnpike Walsh Walsh-PCL
Contained in galleries
2011 06-16 New Pearl Harbor Memorial "Q" Bridge | Contract B Construction Progress | New Haven CT
Connection between completed Contract B1 and Under Construction Contract B. West Northbound Approach Steel-Plate Girder Spans to the New Pearl Harbor Memorial Bridge at New Haven Harbor Crossing, Connectictut. CONNDOT Contract B, Project #92-618. When complete the alternately named Quinnipiac River Bridge will be first Extradosed Engineered Design Bridge in the United States.