James R Anderson Photography

  • Portfolio
  • Image Archives
  • About
  • Contact
  • Legacy Website : photog.com
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 133 images found }

Loading ()...

  • New Haven Rail Yard, Independent Wheel True Facility. CT-DOT Project # 0300-0139, New Haven CT. Progress Photograph of Construction Progress Photo Shoot 8 on 14 February 2012
    120214-20-New-Haven-Railroad-Wheel-T...JPG
  • New Haven Rail Yard, Independent Wheel True Facility. CT-DOT Project # 0300-0139, New Haven CT..Progress Photograph of Construction Progress Photo Shoot 9 on 15 March 2012. One of 52 Images Captured this Submission.
    120315-50-New-Haven-Wheel-True-Shop-...JPG
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-12-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-03-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-32-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-24-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-34-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-33-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-20-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-19-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-17-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-11-Bridge-Pier-Over-Water-Con...jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. First Progress Photography Capture, Contract B1, Project 92-618.
    081218-45-Q-Bridge-Foundation-Constr...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-26-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-23-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-22-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-21-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-15-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-14-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-13-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-09-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-07-Bridge-Pier-Over-Water-Con...jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. First Progress Photography Capture, Contract B1, Project 92-618.
    081218-47-Q-Bridge-Foundation-Constr...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-29-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-28-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-27-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-25-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-18-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-16-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-08-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-05-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-30-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-10-Bridge-Pier-Over-Water-Con...jpg
  • Materials, Equipment & Activies at Over Water Construction Site. Bridge Piers and Casions. Pearl Harbor Memorial Bridge Project B1 Contract 92-618
    090427-31-Bridge-Pier-Over-Water-Con...jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_095.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_087.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_079.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_071.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_069.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_062.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_060.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_058.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_052.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_051.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_049.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_048.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_044.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_041.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_034.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_029.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_021.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_002.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_092.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_098.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_097.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_096.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_094.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_093.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_091.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_090.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_089.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_088.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_086.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_085.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_084.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_083.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_082.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_081.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_080.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_078.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_077.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_076.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_075.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_074.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_073.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_072.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_070.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_068.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_067.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_066.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_065.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_064.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_063.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_061.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_059.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_057.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_056.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_055.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_054.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_053.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_050.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_047.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_046.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_045.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_043.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_042.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_040.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_039.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_038.jpg
  • Pearl Harbor Memorial Bridge Foundation and NB West Approach Construction. Part of the I-95 New Haven Corridor  Harbor Crossing Improvement Program. Second Progress Photography Capture, Contract B1, Project 92-618. Site photographed every 4 months as per CT DOT specifications.
    92-618_090427_037.jpg
Next