  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_077.jpg
  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_079.jpg
  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_076.jpg
  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_080.jpg
  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_078.jpg
  • New Replacement Pearl Harbor Memorial Bridge carrying Interstate 95 and the Tomlinson Lift Bridge connecting New Haven Downtown with Fair Haven and The Annex neighborhoods of New Haven City.
    110616-054-New-Quinnipiac-and-Tomlin...JPG
  • Steel Workers attaching a panel for elevation to the Roof during Steel Erection at the Central Connecticut State University New Academic Building Construction.
    120521-20-CCSU-New-Academic-Office-B...jpg
  • Steel Worker grasping and positioning a roof panel. During Steel Erection at the Central Connecticut State University New Academic Building Construction.
    120521-25-CCSU-New-Academic-Office-B...jpg
  • Steel Worker as a roof segment being lowered to his position during Steel Erection at the Central Connecticut State University New Academic Building Construction.
    120521-24-CCSU-New-Academic-Office-B...jpg
  • Steel Workers attaching a panel for elevation to the Roof during Steel Erection at the Central Connecticut State University New Academic Building Construction.
    120521-23-CCSU-New-Academic-Office-B...jpg
  • Steel Workers attaching a panel for elevation to the Roof during Steel Erection at the Central Connecticut State University New Academic Building Construction.
    120521-21-CCSU-New-Academic-Office-B...jpg
  • Steel Workers attaching a panel for elevation to the Roof during Steel Erection at the Central Connecticut State University New Academic Building Construction.
    120521-22-CCSU-New-Academic-Office-B...jpg
  • Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-25-Bridge-Pick-Fairfiel...jpg
  • Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-28-Bridge-Pick-Fairfiel...jpg
  • Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-01-Bridge-Pick-Fairfiel...jpg
  • Ironworkers erecting Steel at the Central Connecticut State University, New Academic Building. CT- DCS Project No: BI-RC-324 Architect: Burt Hill Kosar Rittelmann Associates. Contractor: Gilbane, Inc.
    120319-10-CCSU-New-Academic-Office-B...jpg
  • Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_014.jpg
  • Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_008.jpg
  • Construction Progress Railroad Station Fairfield Metro Center - One of 33 images taken on 18th site visit of once per month chronological documentation.
    091222-08-Fairfield-Train-Station-Co...jpg
  • Ironworkers erecting Steel at the Central Connecticut State University, New Academic Building. CT- DCS Project No: BI-RC-324 Architect: Burt Hill Kosar Rittelmann Associates. Contractor: Gilbane, Inc.
    120319-09-CCSU-New-Academic-Office-B...jpg
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Eight, 28 August 2013
    130828-01-Coxe-Cage-Renovations-08.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Seven, 15 August 2013. One of 30 Images this Session.
    130815-13-Coxe-Cage-Renovations-07.jpg
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Protective Cover Installation. One of 48 Images this Session.
    130531-22-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-19-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-21-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-20-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-16-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-13-Coxe-Cage-Renovations-03.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_53.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_51.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_50.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_49.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_48.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_46.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_44.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_41.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_40.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_38.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_37.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_36.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_35.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_34.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_33.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_18.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_16.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_15.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_14.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_13.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_12.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-17-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-18-Coxe-Cage-Renovations-03.JPG
  • Renovations and Restoration of Coxe Cage, Yale University Athlectics Facility. Project Started May 2013. Construction Progress Photography Submission Three, 31 May 2013. Overnight Weather Protection Cover Installation. One of 48 Images this Session.
    130531-15-Coxe-Cage-Renovations-03.JPG
  • Construction Progress Photography of the Railroad Station at Fairfield Metro Center. 28th Site Visit, Pre-Construction, of once per month periodic photography coverage of the entire project. Primary Contractor: The Middlesex Corporation, Littleton, MA. Owner: Connecticut Department of Transportation. Serving Metro-North Commuter Railroad.
    101018-34-Fairfield-Train-Station-Co...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_47.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_45.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_43.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_39.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_19.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Girder Pick, Ramp O.
    92-618_100831_17.JPG
  • Boathouse at Canal Dock Phase II | State Project #92-570/92-674 Construction Progress Photo Documentation No. 10 on 19 April 2017. Image No. 10
    170419_92-570+92-674_10-Boathouse-Ca...jpg
  • Crane preparing to Pick Completed Steel Bridge in place over New Haven CT Rail Yard and active Amtrak and Metro-North Commuter Train tracks.
    030503-01-Big-Pick-New-Haven-Railroa...jpg
  • Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-50-Bridge-Pick-Fairfiel...jpg
  • Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-47-Bridge-Pick-Fairfiel...jpg
  • Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-46-Bridge-Pick-Fairfiel...jpg
  • Iron Workers at Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-36-Bridge-Pick-Fairfiel...jpg
  • Iron Workers at Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-34-Bridge-Pick-Fairfiel...jpg
  • Iron Workers at Night Bridge Steel Pick over Northeast Corridor Tracks. Construction of the Railroad Station at Fairfield Metro Center, Connecticut.
    JRA-20100306-32-Bridge-Pick-Fairfiel...jpg
  • New Haven Connecticut Harbor, Pearl Harbor Memorial "Q" & Tomlinson Bridges just east of Interstate I-95 I-91 US Route 34 Interchanges. Long and High View of approaches, bridges, overpasses, ramps, roadway, Quinnipiac and Mill Rivers, within the I-95 New Haven Harbor Crossing Corridor project confines. Also including Harbor Terminal Operations. Photography taken at the beginning of Construction, Contract B1 & E1
    090417-010-Interstate-95-Q-Bridge-Ne...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on September 9, 2011. New Northbound Span, Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States. This view includes Traveling Formwork, North Eastern Tower, river and Tomlinson Lift Bridge bumper pier.
    110909-80-Quinnipiac-Bridge-Construc...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on September 9, 2011. New Northbound Span, Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States. This view includes Western Towers, Traveling Formwork. piers, river and Tomlinson Lift Bridge bumper.
    110909-73-Quinnipiac-Bridge-Construc...JPG
  • Workers unloading Roofing Materials lifted 5 stories. Bridgeport Courthouse GA 2 Renovations. Replace Roof and Masonry Repairs CT Dept of Public Works Project # BI-JD-305. Third Progress Photography Shoot: 17 August 2011
    110817-68-Bridgeport-Courthouse-Reno...jpg
  • Workers unloading Roofing Materials lifted 5 stories. Bridgeport Courthouse GA 2 Renovations. Replace Roof and Masonry Repairs CT Dept of Public Works Project # BI-JD-305. Third Progress Photography Shoot: 17 August 2011
    110817-56-Bridgeport-Courthouse-Reno...jpg
  • Workers unloading Roofing Materials lifted 5 stories. Bridgeport Courthouse GA 2 Renovations. Replace Roof and Masonry Repairs CT Dept of Public Works Project # BI-JD-305. Third Progress Photography Shoot: 17 August 2011
    110817-55-Bridgeport-Courthouse-Reno...jpg
  • Workers unloading Roofing Materials lifted 5 stories. Bridgeport Courthouse GA 2 Renovations. Replace Roof and Masonry Repairs CT Dept of Public Works Project # BI-JD-305. Third Progress Photography Shoot: 17 August 2011
    110817-54-Bridgeport-Courthouse-Reno...jpg