{ 779 images found }

Loading ()...

  • Flyover Ramp as seen from the New Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Camera Location: Northbound West Approaches. Eighth on site photo capture of once every four month chronological documentation.
    110408-176-Route-34-Flyover-View-New...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_05.JPG
  • Central Connecticut State University.  New Academic Building.  Project No: BI-RC-324.Architect: Burt Hill Kosar Rittelmann Associates    Contractor: Gilbane Building Company, Glastonbury, CT..James R Anderson Photography   New Haven CT   photog.com.Date of Photograph: 15 November 2012  Image No. 21.Camera View: North. Sidewalk Ramp.
    121115-21-CCSU-New-Academic-Office-B...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Ramp O.
    92-618_100831_79.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Ramp O and Abutment.
    92-618_100831_72.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Deck, Ramp O.
    92-618_100831_70.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Steel Deck, Ramp O.
    92-618_100831_69.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Ramp I.
    92-618_100831_68.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_07.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_04.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_03.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_01.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Truss under Ramp I.
    92-618_100831_82.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Ramp O.
    92-618_100831_80.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Columns Caps and Girders, Ramp O.
    92-618_100831_67.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_11.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_10.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_06.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Concrete deck pour, Ramp I.
    92-618_100831_02.JPG
  • Central Connecticut State University.  New Academic Building.  Project No: BI-RC-324.Architect: Burt Hill Kosar Rittelmann Associates    Contractor: Gilbane Building Company, Glastonbury, CT..James R Anderson Photography   New Haven CT   photog.com.Date of Photograph: 19 January 2012  Image No. 72.Camera View: South-southeast. Ramp of north site entry.
    120119-104-CCSU-New-Academic-Office-...JPG
  • Fulton Terrace & Kendall Streets near the Pearl Harbor Memorial "Q"  Bridge and alongside Interstate I-95 Interchanges and EB Ramp. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-122-I-95-Q-Bridge-Constructio...jpg
  • Pearl Harbor Memorial "Q" Bridge, East Bound Approaches just west of Bridge. I95 I91 Route 34 Interchange Aerial Photograph. Showing Water Street left-right top, Long Wharf Drive upper left, Wooster Street Ramp and East Street bottom left.
    090417-138-Interstate-91-95-Route-34...jpg
  • Pearl Harbor Memorial "Q" Bridge, East Bound Approaches just west of Bridge. I95 I91 Route 34 Interchange Aerial Photograph. Showing Water Street left-right top, Long Wharf Drive upper left, Wooster Street Ramp and East Street bottom left.
    090417-137-Interstate-91-95-Route-34...jpg
  • New Haven Coliseum as seen on March 11, 1985 from the Rt 34 embankment. Frontage Road in foreground & Knights of Columbus Headquarters in background. Original image is a Kodachrome transparency. my 1979 Ford Fiesta auto is parked in the garage ramp.
    19850311-New-Haven-Coliseum-Northeas...jpg
  • Pearl Harbor Memorial "Q" Bridge, East Bound Approaches just west of Bridge. I95 I91 Route 34 Interchange Aerial Photograph. Showing Water Street vertical center, Long Wharf Drive bottom left, Wooster Street and Ramp upper right and East Street bottom right.
    090417-176c-Interstate-91-95-Route-3...jpg
  • Pearl Harbor Memorial "Q" Bridge, East Bound Approaches just west of Bridge. I95 I91 Route 34 Interchange Aerial Photograph. Showing Water Street vertical center, Long Wharf Drive left, Wooster Street and Ramp upper right and East Street bottom right.
    090417-176-Interstate-91-95-Route-34...jpg
  • Pearl Harbor Memorial "Q" Bridge, East Bound Approaches just west of Bridge. I95 I91 Route 34 Interchange Aerial Photograph. Showing Water Street left-right top, Long Wharf Drive upper left, Wooster Street Ramp and East Street bottom left.
    090417-136-Interstate-91-95-Route-34...jpg
  • Central Connecticut State University.  New Academic Building.  Project No: BI-RC-324.Architect: Burt Hill Kosar Rittelmann Associates    Contractor: Gilbane Building Company, Glastonbury, CT..James R Anderson Photography   New Haven CT   photog.com.Date of Photograph: 20 December 2012   Image No. 13.Camera View: East. Sidewalks, Stairs and Ramps.
    121220-13-CCSU-New-Academic-Office-B...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Ramps I and O.
    92-618_100831_81.JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Sixth on site photo capture of once every four month chronological documentation. Ramps I and O.
    92-618_100831_77.JPG
  • Early Eastbound Approach Construction Contract B1, Pearl Harbor Memorial "Q" Bridge, just east of Interstate I-95 I-91 CT Route 34 Interchanges. Surface road Water Street/Forbes Avenue at left. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-141-I-95-Q-Bridge-Constructio...jpg
  • Early Eastbound Approach Construction, Pearl Harbor Memorial "Q" Bridge, just east of Interstate I-95 I-91 CT Route 34 Interchanges. Surface road Water Street at top. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-140-I-95-Q-Bridge-Constructio...jpg
  • Early Eastbound Approach Construction, Pearl Harbor Memorial "Q" Bridge, just east of Interstate I-95 I-91 CT Route 34 Interchanges. Surface roads Water Street left to right & East Street on right. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-133-I-95-Q-Bridge-Constructio...jpg
  • Early Eastbound Approach Construction, Pearl Harbor Memorial "Q" Bridge, just east of Interstate I-95 I-91 CT Route 34 Interchanges. Surface roads Water Street left to right & East Street top to bottom. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-132-I-95-Q-Bridge-Constructio...jpg
  • Early Eastbound Approach Construction, Pearl Harbor Memorial "Q" Bridge, just east of Interstate I-95 I-91 CT Route 34 Interchanges. Surface road Water Street/Forbes Avenue at top. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-139-I-95-Q-Bridge-Constructio...jpg
  • West of the Pearl Harbor Memorial "Q" Bridge, Interstate I-95 I-91 CT Route 34 Interchanges. Surface roads: East, Water, Hamilton & Franklin Streets. Details of approaches, overpasses, ramps & roadway near or within I-95 New Haven Harbor Crossing Corridor projects confines. Photography taken at the beginning of Contract B1 & E1
    090417-129-I-91-95-Interchange-Q-Bri...jpg
  • Razing the New Haven Coliseum. Project as seen on 13 April 2006 from street views.
    20060413-New-Haven-Coliseum-Razing-G...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-192-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-163-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-152-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-149-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-127-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-106-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-094-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-084-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-082-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-079-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-036-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-019-Quinnipiac-Bridge-Constru...JPG
  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_079.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_066.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_056.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_055.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_037.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_018.jpg
  • Deck Pour. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Eighth on site photo capture of once every four month chronological documentation.
    110408-036-Q-Bridge-Construction-Con...jpg
  • Deck Pour. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Eighth on site photo capture of once every four month chronological documentation.
    110408-015-Q-Bridge-Construction-Con...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-59-Q-Bridge-Construction-New-...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-49-Q-Bridge-Construction-New-...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-45-Q-Bridge-Construction-New-...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-40-Q-Bridge-Construction-New-...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B Photography. Northbound West Approaches toward New, Under Construction, Bridge Spans.
    110408-020-Q-Bridge-Construction-Pro...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Seventh on site photo capture of once every four month chronological documentation.
    101123-24-Q-Bridge-Construction-Cont...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Seventh on site photo capture of once every four month chronological documentation.
    101123-06-Q-Bridge-Construction-Cont...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Seventh on site photo capture of once every four month chronological documentation.
    101123-05-Q-Bridge-Construction-Cont...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-198-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-186-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-172-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-165-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-155-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-109-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-107-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-104-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-091-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-081-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-078-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-072-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-055-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-049-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-040-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-039-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-028-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-022-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-017-Quinnipiac-Bridge-Constru...JPG
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor, Interstate 95 in CT. Construction of Connecticut Department of Transportation Contract B as seen on February 6, 2012. New Northbound Spans Progress of the Replacement Bridge. When complete this will be the first Extradosed Bridge in the United States.
    120206-005-Quinnipiac-Bridge-Constru...JPG
  • Lifting and Aligning Crossmember. Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_080.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_072.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_058.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_057.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_047.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_046.jpg
  • Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_027.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_009.jpg
  • Installing Monotube Highway Sign Support. Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_008.jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Ninth and Final on site photo capture of once every four month chronological documentation.
    92-618_110818_007.jpg
  • Several Workers on a Deck Concrete Pour at the New Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. East end of the Northbound West Approaches. Eighth on site photo capture of every four month chronological documentation.
    110408-113-Q-Bridge-Construction-Con...jpg
  • Pearl Harbor Memorial Bridge, New Haven Harbor Crossing Corridor. CT DOT Contract B1 Project No. 92-618 Progress Photography. Northbound West Approaches. Eighth on site photo capture of once every four month chronological documentation.
    110408-020-Q-Bridge-Construction-Con...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-67-Q-Bridge-Construction-New-...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-54-Q-Bridge-Construction-New-...jpg
  • Construction of the Replacement Pearl Harbor Memorial Bridge, New Haven Connecticut Harbor Crossing. Showing Progress of ConnDOT Contract B as seen on May 19, 2011. Replacement Bridge: New Northbound Piers, Spans and Deck. When complete this will be the first Extradosed Bridge in the United States.
    110519-50-Q-Bridge-Construction-New-...jpg